WESTERLY
SAVE THE FLAGPOLE
THURSDAY, SEPTEMBER 10 @ 9:00PM
As the project winds down, the televisions are mounted, and the blinds and curtains get installed. Richard takes a look at the new water heater. Jenn watches the final plants go in and works to install outdoor lighting. The old flagpole comes down for a touch up.